Bangalore based manufacturer and supplier of building and construction products such as Colour Coated Steel Roofing Sheets, Crimped Sheets, PUF Insulated Sandwich Panel, Z & C Purlins, CR & GI Decking Sheets etc

BUILDING COMPONENTS
- Coated Steel Roof and Wall Panels
- Decking Sheet
- Z & C Purlins
- Clay Tile Profile Panel
- Insulated Sheet
- Sandwich Puff Panels
- Roof Decking Sheets
- Roof Purlin
PRE ENGINEERED BUILDING SYSTEMS
- Pre Engineered Building
- PEB Vs Conventional Buildings
ALFA ROOFING SOLUTIONS
- Standing Seam Roofing
- Turbo Ventilators
- Bubble Foil Insulator

- Authorized Erectors
- Branch Address
- Clientele
- Testimonials


Quality Standards
An ISO 9001 : 2000 certified




Inquiry Basket (0)


PEB Vs Conventional Buildings

Click here for an enlarged view
PEB Vs Conventional Buildings

PEB

  • Structure weight is 30% less through efficient use of steel

  • Columnless large spans are possible.

  • Factory controlled quality.

  • Lower initial cost (cost per square meter is about 30% less than the conventional constructions) and faster delivery.

  • Unique architectural designs can be achieved at low cost.

  • Seismic Resistance: The low weight flexible frames offer higher resistance to seismic forces.

  • Delivery time is average 6-8 weeks

  • Foundation: simple design, easy to construct and light weight.

  • Aesthetically appealing appearance at a lower cost.

  • By following the international design standards & codes using standard sections and connections reduce the design time drastically.


Conventional Building

  • Practice of excessive safety factor and the usage of heavier steel sections keep the weight high

  • Every project has to start from the beginning and to be fabricated at site.

  • Cost is more and delivery takes more time

  • Special design and features must be developed for each project and at a higher cost.

  • Rigid heavy weight structures do not perform well in seismic zones.

  • Delivery time is average 22-28 weeks

  • Extensive heavy foundation is required

  • Special aesthetic design may increase the cost.

  • Each structure is designed from scratch and availability of the design aids are less, thus increases the design time.





     

Home     |     Company Profile     |     Our Products     |     Trade Offers     |     Contact Us     |     Send Inquiry